Framing is where everything else starts. If the bones aren't right, nothing built on top of them will be either.
Interior partition walls, room divisions, closets, and bump-outs. Proper stud layout, blocking for drywall and fixtures.
Identifying load paths, proper header sizing, temporary shoring during modifications. We know when an engineer stamp is required and will tell you upfront.
Opening up walls for wider doorways, pass-throughs, and window enlargements. Proper header sizing per IRC span tables.
Perimeter wall framing, chase construction, mechanical clearances, and layout for future drywall and electrical rough-in.
Sistering damaged joists and studs, replacing rot-compromised members, correcting previous bad work.
Coordination with foundation, floor system, wall framing, and roof tie-in for additions.
Light-gauge metal framing for commercial partitions, shaft walls, and moisture-prone areas.
Squeaky floor repair, joist sistering, beam replacement, and subfloor panel replacement over crawlspaces and basements.
Get real specs, code references, material recommendations, and troubleshooting help 24/7 โ before you call us, while you wait, or just to understand your project better. No subscription required for your first 3 questions.
Ask B34M Free โ